← MCC-OE: Measured-Construct Closure and Observable Exhaustion / MCC-OE-24 · Primary eight-chart quadratic closure and finite wall-layer reduction (research-interval)

MCC-OE: Measured-Construct Closure and Observable Exhaustion MCC-OE-24 · Primary eight-chart quadratic closure and finite wall-layer reduction (research-interval) Neo.K (as signed) Recovered 2026-10-07

Primary Eight-Chart Quadratic Closure and Finite Wall-Layer Reduction: from the Global Minimum 0.106083 of Ψ2 to the Regular-Chart Finite Lower Bound 0.105758, Reducing the Remaining B01 Boundary Responsibility to Single and Double First-Order Wall Layers

In each of the eight first-order sign charts of the B01 velocity box (the signs of E_T, E_L, E_R) the second-order coefficient Ψ2 is a quadratic polynomial in (u, v, w) — its coefficients are rebuilt from mpmath.iv node values and an exact-rational interpolation inverse, not from a least-squares fit — with global minimum 0.106083369526 at u = 6, v = −0.15, w ≈ −0.004329, matching the counter-search basin of MCC-OE-11. With the third-order term (|Ψ3| < 0.425623) and a whole-box interval tail J4–J12, the finite remainder on the regular charts is R2fin > 0.105758417246, above the target 0.1. On the first-order wall faces Ψ2 > 0.108236986147, and outside the critical tube (|x| ≤ 100, |y| ≤ 1, |z| ≤ 1) the first-order coefficient is bounded below by 0.0152028. What still has no certificate is only the finite O(ρ) layers of single and double walls.

At the authors' own research-interval authority, R2fin > 0.105758417246 > 0.1 on the regular primary charts of B01, and the triple critical tube (MCC-OE-23) is closed; the finite O(ρ) single-wall and double-wall layers, the full B01 boundary, the B01 parent and global Lebesgue are all explicitly not claimed. This is the paper the series was missing (paper 25 depends on it); it was recovered by GPT from the ChatGPT Library only on 2026-10-07, and the title its §50 suggests for MCC-OE-25 is the title paper 25 actually carries. The coefficients rest on mpmath.iv and exact-rational reconstruction with no independent backend; the paper labels its 8192-point Sobol audit DIAGNOSTIC ONLY, which cannot replace an interval proof for the wall layers. 'PASS' and 'CLOSED' are the authors' own research-interval status words.

Connections · Connections

This is a full-text translation of the Chinese source, which remains authoritative for its research claims. Translation is not independent mathematical verification and does not upgrade the original evidence level.

Loading…