← MCC-OE: Measured-Construct Closure and Observable Exhaustion / MCC-OE-25 · B01 boundary closure (research-interval)

MCC-OE: Measured-Construct Closure and Observable Exhaustion MCC-OE-25 · B01 boundary closure (research-interval) Neo.K (as signed)

Finite First-Order Wall-Layer Bridge and B01 Boundary Closure: Exact Finite-Width Sign Transfer, Relaxed Eight-Template QP, and Elimination of WL-1/WL-2

Taylor sign transfer reduces the finite wall layers WL-1/WL-2 to a relaxed eight-template quadratic program (min Ψ2 ≈ 0.10608; wall-sensitive 0.10792), giving R2fin > 0.105758 and A > A0 + 0.1ρ² on the whole declared B01 box: 'B01 BOUNDARY RESEARCH-INTERVAL CLOSED' and 'B01 LOGICAL ROUTE COVER 100% / RESEARCH-INTERVAL'.

At research-interval authority the full route cover of the B01 boundary is considered closed; the radial integration to the parent is still OPEN in this paper. '100%' and 'CLOSED' must be read together with their authority qualifier; the B01 ρ-slab is only [1e-4, 1.4e-4]; the paper depends on paper 24 (recovered only on 2026-10-07) and on LESR 09E.

Connections · Connections

This is a full-text translation of the Chinese source, which remains authoritative for its research claims. Translation is not independent mathematical verification and does not upgrade the original evidence level.

Loading…